SAFE & SCALABLE INSTALLATION OF LINE HARDWARE

Infravision is installing line hardware on overhead earth wires and conductors using unmanned aircraft. This allows our customers to significantly reduce risk and costs by up to 67%.

Book a demonstration today.

CURRENT CAPABILITIES

Installation of Bird Diverters/Flappers

  • The PLP Raptor Payload enables the unmanned aircraft to remotely install Raptor Bird Diverter Clamps utilising an onboard targeting system and flight path cueing to accurately apply the clamps.

In development:

  • Marker ball installations
  • Spacers installation
  • Vibration dampeners installation
  • General line hardware
  • Site construction services by unmanned aircraft

CURRENT CAPABILITIES

Installation of Bird Diverters/Flappers

  • The PLP Raptor Payload enables the unmanned aircraft to remotely install Raptor Bird Diverter Clamps utilising an onboard targeting system and flight path cueing to accurately apply the clamps.

Coming soon…

  • Marker ball installations
  • Spacers installation
  • Vibration dampeners installation
  • General line hardware
  • Site construction services by unmanned aircraft

UP TO 120 INSTALLED
PER DAY

Payload, onboard targeting system and flight path cueing to accurately apply the clamps.

REDUCE OPERATIONAL
RISK

Eliminate working from heights risk associated with traditional methods.

67% COST
REDUCTION

Increase in operational efficiency means Infravision delivers material cost savings.

PROJECTCOMPLETION DATEOUTPUT
330kV Industry DemonstrationJune 2019

Stringing

Snowy Mountains 330kV Bushfire RepairsMarch 2020Stringing
Fibre Optic New ConstructionApril 2020Stringing
Bird Diverter Installation TrialMay 2020Line Hardware Install
132kV Wind Farm Connection New ConstructionJuly 2020Stringing
330kV Bird Diverter InstallationOctober 2020Line Hardware Install
Snowy Mountains 330kV RefurbishmentNovember 2020Stringing
Storm Damage 132kV – InspectionDecember 2020Asset Inspection
132kV New ConstructionFebruary 2021Stringing
132kV Overhead Earth Wire Repairs (Live Line)April 2021Stringing + Disentanglement
Distro Emergency Repairs (1.5km / 4660ft span)June 2021Stringing

CASE STUDY

STOCKDILL

TransGrid was looking for an alternate method of installing line hardware on overhead earth wires and conductors due high risk and cost of available methods.

Explore Project Details
Watch the Video

GET IN TOUCH

Learn more about the Infravision TX System or simply contact us.

Learn More
Contact Us